Excavation & earthwork quantities

Earthwork Mass Haul

Builds the mass diagram of a drawn road corridor from its station volumes, finds the balance points and works out the volume moved, the haul volume-distance, the average haul, the overhaul beyond a free haul, the surplus or borrow at the end of the line and the single eligible site with the least total haul for it (the least-haul single-site choice; rates do not enter it), truck loads and, with your own rates, a cost. The volumes come from the drawing and are never re-measured here.

Last updated
This page is provided by LogicCommons for informational purposes only. Results are analysis outputs computed from the inputs you supply and are not engineering advice, a design, or a substitute for review by a licensed professional under the codes adopted where the work is built. Verify all inputs and results independently.

LogicCommons is in beta. If a result, label, or reference looks wrong, tell us here; we read every message.

Methodology

Purpose and model boundary

This estimator balances the earthwork of a road or rail corridor. You draw the centreline over a soil model, give the vertical profile and the typical section, and add the borrow pits, waste sites and use sites with their haul routes. The drawing measures the corridor: the cut, the fill and the topsoil strip between each pair of cross sections, the cut in each soil, and each haul route's length and the station where it joins the road. The spreadsheet then applies your shrink and swell factors, builds the mass diagram, finds the balance points, and works out the moved volume, the average haul, the overhaul, the truck loads and, with your own rates, the cost.

It covers one corridor at a time (roads and rail spurs). Moving material between many separate cut and fill areas, pavement design, slope stability, drainage and excavation safety are outside this estimator.

Inputs and units

Everything is in metres and cubic metres. The drawing owns the alignment (plan vertices and start station), the profile points (station and elevation, joined by straight grades), the typical section (half-widths, crossfall, cut and fill slopes as horizontal to vertical, and the topsoil strip depth), the section interval, and the sites. The panel holds what the drawing cannot know: whether each soil can be used in the fill and its swell percent, the shrink percent for embankment, whether stripped topsoil is replaced, the free-haul distance, the balance tolerance, the truck capacity, the haul swell and your rates. Shrink and haul swell must be entered; a rate left blank leaves that cost unpriced.

Governing relationships

  • Interval volume by the average end-area method: length between sections times the mean of the two end areas. The cut is bank volume without the topsoil strip; the fill is compacted volume; no factor is applied in the drawing.
  • Adjusted fill = fill x (1 + shrink); with topsoil replacement, the strip volume is added as fill needed.
  • Usable cut is the cut of the soils marked usable, with swell where entered; unsuitable cut goes to a waste site.
  • Mass ordinate at a station = the running sum of usable cut minus adjusted fill up to that station.
  • Balance points are where the ordinate crosses zero, found by straight-line interpolation between stations.
  • Between balance points: moved volume = the largest ordinate reached; volume-distance = the area under the ordinate; average haul = volume-distance / moved volume; overhaul = moved volume x (average haul - free haul) when positive.

Calculation sequence

  1. The drawing measures every cross section and interval and refuses a corridor that crosses ground the boreholes do not cover.
  2. The spreadsheet checks the measured rows against their totals.
  3. It adjusts the cut and fill, builds the mass ordinate and finds the balance points.
  4. It chooses the single eligible site with the least total haul (the least-haul single-site choice; rates do not enter it). For a line that ends with a surplus, it tries each waste or use site; for a line that ends with a deficit, it tries each borrow pit. Each candidate's total haul is the in-line haul with the end volume exchanged where the site's route joins the road, plus the end volume times the route length (and the gap to a join beyond either end of the line). The site with the least total haul is chosen; on a tie, the first row wins. The in-line moves are then computed with that site. Unsuitable cut goes to the waste site with the least haul for it, spread evenly over each interval it comes from. Because overhaul is priced on the along-line leg, a site with less total haul can cost more once rates are entered; the choice still follows the haul.
  5. It counts truck loads and prices each cost part that has a rate.

Outputs and interpretation

The results give the cut, usable and unsuitable cut, fill and adjusted fill, borrow and excess, the balance note, the balance points, the moved volume, the volume-distance, the average haul, the overhaul, the loads and the cost by part, with a table of the balanced segments and of each haul move. The mass diagram is drawn from the spreadsheet's own ordinates.

Worked examples

Five practical examples are provided: a 600 m rural highway realignment, a business-park access road whose surplus fills the building pad, a rail spur fed from an off-site borrow pit, a subdivision loop street with topsoil replacement, and a deep highway cut through mixed soils with no prices. The soil models are illustrative synthetic sites. Selecting an example replaces the current project. Save your edits first.

Validation and status logic

The status reads OK, CHECK: with something to read with care, or NOT VALID: with the first problem to fix. Under NOT VALID every result is blank. A corridor over unknown ground, a missing required factor, or a value outside its range stops the calculation with a plain message.

Assumptions and limitations

Ground between boreholes is interpolated; the volumes are geometry on that model, not a survey. The average end-area method differs slightly from the true solid between sections, most at bends and where the ground changes quickly. The overhaul uses the average-haul method. Factors and rates in the examples are illustrative and must be replaced with your project's values. Sites and their routes are drawn on the plan, which has no zoom or pan and no typed coordinates yet, so a site far outside the soil-model area (for example a distant borrow pit) cannot yet be placed by hand; load the worked example "Rail spur fed from an off-site borrow pit" to see one.

Restrictions and non-computing states

No result is given until a centreline is drawn and fully measured. A corridor whose sections or side slopes reach outside the soil model has no volume there; it is refused rather than estimated.

Errors and warnings

Messages name the station range or the field to fix. Natural Neighbor ground gives a CHECK because its volumes are approximate.

References

Sources and further reading

  • Earthwork computations, shrink and swell factors, balancing, the mass diagram and topsoil replacement: Montana Department of Transportation, Road Design Manual, January 2026 revision, sections 13.3.1 to 13.3.5 and 12.3.8.4. mdt.mt.gov
  • Earthwork estimating factors used in the illustrative examples: U.S. Federal Highway Administration, Office of Federal Lands Highway, Project Development and Design Manual, "Earthwork Design", Exhibit 5.1 A (pending re-verification before publication). highways.fhwa.dot.gov
  • Unit price for unclassified excavation used in the illustrative examples: Montana Department of Transportation, Weighted Average Prices Catalog, 1 January to 31 December 2025 (pending re-verification before publication).

The other example rates and the truck capacity are illustrative assumptions of the examples, dated 2026-11-20. Replace every factor and rate with your project's own values. Slope stability, pavement design and excavation safety are outside this estimator and are not assessed here.

Results are informational and not professional advice. See our Terms of Use. Powered by SpreadsheetWeb · About · Privacy · Terms